Featured job
I-94 River Crossing — Deck & Girder Package
Midwest Bridge & Steel
Job 241180 · 2024-03-11 → 2025-11-22 · 2840 hrs
Lead connector on the night raise for the northbound main span. Sequenced 42 plate girders, held splice tolerances through freeze-thaw swings, and kept the night deck crew ahead of concrete pour windows. Coordinated crane picks with the floating barge crew and closed every hold-point inspection on the first pass.
- 0512. — Structural steel erection · 1680 hrs
- 0516. — Field bolting & splice · 620 hrs
- 0150. — Crane & pick support · 340 hrs
- 0170. — Safety / hold-point QC · 200 hrs
Lakeside Regional Medical Center — Wing C Steel
Midwest Bridge & Steel
Job 230912 · 2023-01-09 → 2024-02-28 · 1960 hrs
Raised the six-story Wing C structural frame over an active hospital campus. Managed weekend crane windows, protected occupied corridors below, and sequenced ORs so surgery never lost HVAC. Taught two first-year apprentices to read erection drawings and call out clash risks before the pick.
- 0512. — Structural steel erection · 1180 hrs
- 0530. — Metal deck & edge angle · 410 hrs
- 0550. — Misc metals / embeds · 220 hrs
- 0170. — Hospital campus safety escort · 150 hrs
Metro Arena — Roof Truss Install
Midwest Bridge & Steel
Job 221445 · 2021-08-16 → 2022-07-30 · 1720 hrs
Part of the long-span roof truss crew for a 14,000-seat arena. Set 18 primary trusses on temporary falsework, surveyed camber after each release, and ran the bolt-up with a three-person hanging crew. Zero lost-time incidents across 11 months of elevated work.
- 0512. — Long-span truss erection · 980 hrs
- 0516. — Field bolting & splice · 440 hrs
- 0150. — Falsework & crane support · 200 hrs
- 0170. — Elevated work / fall protection · 100 hrs
Northside Water Reclamation — Process Building Steel
Midwest Bridge & Steel
Job 210778 · 2020-04-06 → 2021-05-14 · 1480 hrs
Erected the process building and clarifier walkways while the plant stayed online. Worked tight clearances around live piping, set equipment platforms to ±1/8", and coordinated every pick with plant operations so residual chlorine systems never went offline.
- 0512. — Process building steel · 760 hrs
- 0550. — Platforms & walkways · 380 hrs
- 0516. — Field bolting · 220 hrs
- 0170. — Live-plant safety escort · 120 hrs
Harbor Freight Terminal — Crane Runway & Transfer Shed
Great Lakes Iron LLC
Job 190334 · 2018-02-12 → 2019-09-27 · 2140 hrs
Past-employer highlight: built the 900-ft crane runway and transfer shed for a Great Lakes freight terminal. Ran night shifts around vessel schedules, set runway beams to mill-spec camber, and left the owner a complete as-built bolt map for future rail maintenance.
- 0512. — Crane runway steel · 1240 hrs
- 0530. — Transfer shed framing · 480 hrs
- 0516. — Field bolting & as-built · 280 hrs
- 0150. — Night pick / barge support · 140 hrs